Downe Hospital, Downpatrick, Co. Down, Northern Ireland

Client: South East Trust, Northern Ireland
Value: Circa £697,000

This contract involved construction of an operating theatre at Downe Hospital, which was the first fully constructed modular operating theatre in Northern Ireland.

One of the challenges to this project was the restricted space available for expansion. Due to the small space available on Site, our team designed and installed a steel supporting framework consisting of 5 steel framed modules so that the new building could be located at first floor level and could be connected by corridor to the existing facilities, causing minimum disruption to the hospital.

The project also had a tight deadline of 20 weeks from initial design to completion and was finished and handed over within the specified timeframe and on budget.

 

Speak to us today

Request a call back or call us on 0207 228 5282 (UK) or 01 467 3100 (Ireland).