Addenbrooke's Hospital, Hills Road, Cambridge, Cambridgeshire CB2 0QQ

Client:  Cambridge University Hospitals NHS Foundations Trust
 

Extraspace Solutions were awarded the contract to Design and Build a New three storey changing facility to accommodate the two new EVAR Theatres within Addenbrooke Hospital. 

 The New facility was designed to cater for both Male and Female staff and includes full changing facilities and gowning areas.  The building is connected to the Hospital on three levels through four separate links which involved detailed design and intricate coordination.   

 The building includes a full BMS trend system, with a new Plantroom to house  a dedicated AHU to feed all three floors.  Mechanical ventilation and Radiant heating panels provide full temperature control. The building is fully compliant with the latest HTM/HBN codes and Extraspace Solutions achieved full Building Control Compliance on behalf of the Trust.

 

The Project commenced in October 2014 and was completed in Jan 2015 in line with the tender programme.

 

Speak to us today

Request a call back or call us on 0207 228 5282 (UK) or 01 467 3100 (Ireland).